An addition and remodel feasibility study designed to address and provide a solution to the expanding functions of the existing facility. The design includes a precast concrete envelope with a steel structure that provides space for pre-print/ miscellaneous storage, distribution center, enclosing an existing dock area, machine repair, maintenance area, break room, rest rooms, and two new loading docks for Wyoming's largest and only statewide circulating paper.

Building Exterior Floor Plan

 

 

Location
Casper, Wyoming

Owner
Casper Star Tribune
Nathan Bekke, Publisher
307-266-0503

Role
Design Architect

Personnel
Lyle Murtha, Principal Architect
Anthony Jacobsen, Project Manager

Scope
Schematic Design
Feasibility Study

Size
11,600 Square Feet Addition
1,900 Square Feet Remodel

Cost
$2 million (Estimate)

Completed
2009 (Design Work)