Diamond Companies

Stateline No. 7 Architects was the design architect and involved in the design and planning work only; a separate architect was the architect of record. The project included programming and schematic design of a two-story lodge-looking office building with a full basement parking garage on a master planned site to be developed with other future buildings. The building was designed to be stick-built with variable refrigerant volume HVAC system, one of the foremost thinking in green technology.

 

 

Location
Casper, Wyoming

Owner
Diamond Companies
Kip True, Owner
307-233-3900

Role
Design Architect

Personnel
Lyle Murtha, Principal Architect

Scope
Schematic Design

Size
30,000 Square Feet

Completed
2007 (Design Work)