Stateline No. 7 Logo

Bio-Mass Star Academy 12279 Brady Drive       Custer, South Dakota 631

 A first-of-it’s-kind environmentally-sensitive wood-chip “Bio Mass” boiler facility for the South Dakota Office of the State Engineer at the Star Academy Juvenile Corrections Center near Custer, South Dakota, completed in Spring, 2008.

Mobile Concrete                                       606 Southwest Wyoming Blvd.        Mills, Wyoming

 Completed in 2000, the 14,000 square foot two-story award winning building was constructed for approximately $90 per square foot. The re-use of historic lattice columns and trusses along with a ground-source geothermal HVAC system and high-fly ash concrete made this building “green” long before the green building movement.

Dr. Hardy Clinic                     4611 Arroyo Drive          Casper, Wyoming

 This 10,000 square foot oral and maxillofacial surgery clinic consists of a main surgery center, a tenant space, and a property maintenance garage. The HVAC system is one of the foremost thinking in green technology, a variable refrigerant volume system, that minimizes energy consumption. The building was completed Summer, 2011.